Suncoast_Airport_Terminal_B_RFP.pdf
Tampa Bay Aviation Authority
RFP 142 Analyzed 3 High 5 Med Feb 19, 2026
Metro_Transit_Hub_Contract_Draft.docx
Denver RTD
Contract 87 Analyzed 1 High 3 Med Feb 17, 2026
Cascade_Office_Tower_Specifications.pdf
Cascade Development Group
Specification 210 Processing Just now
Back to Uploads
Suncoast Airport Terminal B RFP
Tampa Bay Aviation Authority · 142 pages · Analyzed Feb 19, 2026
Extracted Parameters
Project Name
Suncoast Airport Terminal B Expansion
Location
Tampa International Airport, Tampa, FL 33607
Building Type
Airport Terminal — Passenger Processing
Size
320,000 SF (new) + 45,000 SF (renovation)
Occupancy
A-3 / B / S-2 (Assembly, Business, Parking)
Special Requirements
FAA Advisory CircularsTSA SecurityNEPA EnvironmentalADA AccessibilityHurricane Zone
Regulatory Applicability
Florida Building Code 8th Ed. IBC 2021 FAA AC 150/5300-13B NFPA 13 / 72 / 101 ADA / ADAAG 49 CFR 1520 (SSI) NEPA Hillsborough County Amendments
Risk Flags
SSI Document Handling Requirements
RFP references Sensitive Security Information (SSI/TSA). Cannot be stored in cloud per 49 CFR Part 1520.
HVHZ Wind Load Requirements
Florida High Velocity Hurricane Zone. FBC Section 1609 requires enhanced wind load design.
NEPA Environmental Review Scope
Terminal expansion likely triggers Environmental Assessment (EA) under NEPA. Can add 6-18 months.
FAA AC 150/5360-13A Terminal Planning
RFP specifies Level of Service C but references outdated IATA standards.
Liquidated Damages Clause
Contract includes $15K/day LD without carve-out for regulatory delays.
Compliance Checklist
Structural load path per FBC Section 1604
ADA accessible routes and signage per ADAAG
Fire sprinkler design per NFPA 13 — needs HVHZ review
SSI handling protocol not addressed in RFP scope
NEPA environmental review timeline not included