Upload & Analyze
Upload RFPs, contracts, and specifications for automated regulatory analysis
Drop files here or click to upload
Supports PDF, Word (.docx), and Excel (.xlsx) up to 200 pages
Recent Uploads
| Document | Type | Pages | Analysis Status | Risks Found | Uploaded | Actions |
|---|---|---|---|---|---|---|
|
Suncoast_Airport_Terminal_B_RFP.pdf
Tampa Bay Aviation Authority
|
RFP | 142 | Complete | 3 High 5 Med | Feb 19, 2026 | |
|
Metro_Transit_Hub_Contract_Draft.docx
Denver RTD
|
Contract | 87 | Complete | 1 High 3 Med | Feb 17, 2026 | |
|
Cascade_Office_Tower_Specifications.pdf
Cascade Development Group
|
Specification | 210 | Processing... | -- | Just now |
Analysis — Suncoast Airport Terminal B RFP
Extracted Parameters
Project Name
Suncoast Airport Terminal B Expansion
Location
Tampa International Airport, Tampa, FL 33607
Building Type
Airport Terminal — Passenger Processing
Size
320,000 SF (new) + 45,000 SF (renovation)
Occupancy Classification
A-3 / B / S-2 (Assembly, Business, Parking)
Timeline
Design: 12 months · Construction: 24 months
Special Requirements Detected
FAA Advisory Circulars
TSA Security
NEPA Environmental
ADA Accessibility
Hurricane Zone
Flagged Risks
8 items
High Risk (3)
SSI Document Handling Requirements
RFP references Sensitive Security Information (SSI/TSA) documents. These cannot be stored in cloud systems per 49 CFR Part 1520. Manual entry workflow required.
HVHZ Wind Load Requirements
Project is in Florida High Velocity Hurricane Zone. FBC Section 1609 requires enhanced wind load design beyond standard ASCE 7. Impact-resistant glazing required.
NEPA Environmental Review Scope
Terminal expansion likely triggers Environmental Assessment (EA) under NEPA. RFP does not mention NEPA timeline, which can add 6-18 months to preconstruction.
Medium Risk (5)
FAA AC 150/5360-13A Terminal Planning
RFP specifies Level of Service C but references outdated IATA standards. Current FAA AC may conflict.
Liquidated Damages Clause — Regulatory Delays
Contract includes $15K/day LD for delays but does not carve out regulatory approval timelines. Recommend negotiating force majeure clause.
Sustainability Requirements — LEED Silver
RFP requires LEED Silver minimum. Energy code compliance path must align with LEED credits to avoid duplication of effort.
Generated Compliance Checklist
| Requirement | Code Reference | Category | Priority | |
|---|---|---|---|---|
| Obtain FAA airspace determination (Form 7460-1) | 14 CFR Part 77 | Aviation | High | |
| Initiate NEPA Environmental Assessment process | 42 USC §4321 | Environmental | High | |
| Verify TSA/SSI document handling protocols | 49 CFR Part 1520 | Security | High | |
| Confirm HVHZ applicability and wind load requirements | FBC §1609 | Structural | High | |
| Prepare ADA accessibility compliance plan | ADA §4.1 | Accessibility | Medium | |
| Review fire/life safety requirements for A-3 occupancy | FBC Ch. 9 / NFPA 101 | Fire Safety | Medium |